EasyManua.ls Logo

Manitowoc Grove YB5515-2 - Section 6 Maintenance; Maintenance Introduction and Schedule

Manitowoc Grove YB5515-2
293 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PREVENTATIVE MAINTENANCE CD5515-2/YB5515-2 SERVICE MANUAL
5-8 Published 1-20-2017, Control# 483-02
Lubrication Points
Apply grease to the following fittings after the first 20 hours of
operation, thereafter every 50 hours of operation or weekly,
whichever occurs first. Use a Lithium Base, E.P. No. 2
bearing grease or equivalent. Apply enough grease to
remove the old grease.
NOTE: *Drive shaft u-joints do not require routine
lubrication. Lubricate only after major overhaul.
Booms and Main Frame
Location QTY
Mast Bearing (see Figure 5-1) 2
Boom Pivot (see Figure 5-2) 2
Boom Head Sheaves and Pivot (see Figure 5-3) 2
Lift Cylinder Pivots (see Figure 5-5) 2
Drive Train
Location QTY
Steering Knuckles- front axle (see Figure 5-6) 4
Steering Knuckles- rear axle (see Figure 5-7) 4
Steering Link- front axle (see Figure 5-8) 2
Steering Link- rear axle (see Figure 5-9) 2
Steering Cylinder Pivot Ends- front axle (see Figure 5-10) 2
Steering Cylinder Pivot Ends- rear axle (see Figure 5-11) 2
Drive Shaft- front axle (see Figure 5-12)* 2
Drive Shaft- rear axle (see Figure 5-13)* 2
Rear Axle Pivot (see Figure 5-14) 2
Optional Equipment and Accessories
Location QTY
Drop Block (see Figure 5-15) 2
Jib Boom Head Sheave (see Figure 5-16) 1
Jib Boom Deflector Sheave (see Figure 5-17) 1
Reference Only

Table of Contents

Other manuals for Manitowoc Grove YB5515-2

Related product manuals