EasyManuals Logo

Manitowoc I0320 User Manual

Manitowoc I0320
182 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #33 background imageLoading...
Page #33 background image
Part Number STH038 5/12 31
C. Remove the water level probe
Pull the water level probe straight down to
disengage.
Lower the water level probe until the wiring
connector is visible.
Disconnect the wire lead from the water level
probe.
Remove the water level probe from the ice
machine.
D. Remove the ice thickness probe
Compress the hinge pin on the top of the ice
thickness probe.
Pivot the ice thickness probe to disengage one pin
then the other. The ice thickness probe can be
cleaned at this point without complete removal. If
complete removal is desired, disconnect the ice
thickness control wiring from the control board.
E. Remove the water distribution tube
NOTE: Distribution tube thumbscrews are retained to
prevent loss. Loosen thumbscrews but do not pull
thumbscrews out of distribution tube.
Loosen the two outer screws (do not remove
screws completely they are retained to prevent
loss) and pull forward on the distribution tube to
release from slip joint.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc I0320 and is the answer not in the manual?

Manitowoc I0320 Specifications

General IconGeneral
BrandManitowoc
ModelI0320
CategoryIce Maker
LanguageEnglish

Related product manuals