EasyManua.ls Logo

maxilift 3300W - Putting the Crane into Service; Ten Rules for the Perfect Crane Operator; Daily Check List; Crane Protection and Storage

maxilift 3300W
48 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
23
8 PUTTING THE CRANE INTO SERVICE
8.1 TEN RULES FOR THE PERFECT CRANE OPERATOR
Always comply with the following ten basic rules:
1 - When approaching the crane for the first time, become on familiar terms with it, executing all the
manoeuvres the crane can perform during working. Carefully read all the prescriptions of this
manual and execute step by step the activities hereby described to be sure of the correct under
standing.
2 - This manual must always be carried in the drivers cab along with a copy of the load chart.
3 - Every operation has to be planned with care.
4 - Get all the necessary information for reaching the working site: distance, itinerary, heigth of exi
sting tunnels, capacity of the bridges to be crossed, etc.
5 - Study and plan the best way to operate the crane: soil consistence, weight and dimensions of the
loads to be lifted, heigth to be raised and necessary booms outreach. Check available room or
limitations due to the presence of buildings, obstacles, electricity power lines, etc.
6 - Make sure of availability of all the necessary equipment: accident-prevention clothings, additional
bearing plates with increased surface area, slings, hooks, ropes and chains of certified origin and
in perfect conditions.
7 - Before starting crane operations check the efficiency of the safety control devices. Never use the
crane if the correct functioning of a device is not sure.
8 - Traffic and safety laws in force must be strictly observed both when travelling on road and when
operating the crane.
9 - The warnings of these manual referred to special dangers are to be read and observed with
special care.
10 - The safety during the crane service must be kept to the highest level carrying out a regular,
constant and accurate preventive maintenance. Repairs if necessary should never be delayed,
and must be made by specialized, authorized people using only genuine spare parts.
8.2 DAILY CHECK LIST
Check the existence of oil leaks
Check the correct working of the load limiting device.
Check oil level and fill up if necessary
Check the good conditions of hoses and piping
Check the good conditions of painting and chrome plating
Check the correct working of safety valves.
Check winch brake’s functioning
8.3 CRANE PROTECTION AND STORAGE
8.3.1 Short shutdowns
Wash and clean the crane, lubricate all the parts provided with grease nipples and the slewing system.
ATTENTION
Never wash the crane with chemical products or high pressure water jets, as they can cause
the detaching of the stickers water entering inside the electrical components and the slewing
case.
View thousands of Crane Specifications on FreeCraneSpecs.com
View thousands of Crane Specifications on FreeCraneSpecs.com

Table of Contents

Related product manuals