SUMMARY OF CHANGES: M-16-40 REVISION C
PAGE DESCRIPTION OF CHANGE
COVER Updated REV. and date of release.
Transit hook with handle tab on the bottom is shown throughout manual.
10, 11
Added Quarterly/1250 Cycles PM CHECK to measure and adjust clearance be-
tween main housing and bottom of stowed platform and fl ipover.
13 Removed table of recommended ISO 32 oils.
16
Added a Note and Table to explain torsion bar functionality, conditions for adjust-
ment and corrective actions.
16-32
Changed torsion bar adjustment & replacement instructions into separate proce-
dures with hoist and stands to support platform, and a wrench to position torsion
bar pins.
33-35
Added procedure MEASURE & ADJUST CLEARANCE FOR PLATFORM WITH
FLIPOVER.
37
Decal sheet changed to P/N 298155-03 because of changes on the operation
instructions for decal "A".
43, 44
Updated numbered wiring connections for inner and outer switches on electrical
schematic.