Page 12 of 36 M-21-08 REV.B
1. Attach Solar Box to Liftgate Channel.
a. Position Solar Box 14” to the right of the liftgate Junction Box.
b. Using the Solar Box as a guide, drill two 3/8” holes into Liftgate Channel. Note: Liftgate
can be slid out approximately 24” to drill holes from the bottom of the Solar Box.
BOTTOM VIEW
c. Bolt Solar Box to liftgate channel with 3/8” x 1.5” grade bolts and locknuts. Tighten to
30 lb-ft.
2. If Solar Box contains an Optio3/WAYPOINT monitoring system, prepare Charge Controller to
connect to WAYPOINT.
• Cut off data connector on Charge Controller