Page 17 of 36    M-21-08 REV.B 
 
12. Route 3 wire gray cable from Solar Box through cord grip in the Junction Box. 
•  Reinstall backing plate to Junction Box with four screws and spacers removed in step 5. 
•  Crimp and heat shrink #10 ring terminals to wires and connect as shown below. 
 
13. Tighten cord grip outer nut to compress and seal grommets. 
 
14. Provide drip loop for all cables running into the Junction Box.  
 
15. Connect PV+ and PV- connectors in Solar Box to Charge Controller. 
 
 
 
   
WALL SWITCH WIRES 
HARNESS GROMMET 
TERMINAL #1 (UP) 
TERMINAL #2 (DOWN) 
YELLOW/GREEN WIRE TO 
TERMINAL #8 (ALL SW) 
CONNECT PV+ AND PV- CABLES 
TO CHARGE CONTROLLER