EasyManua.ls Logo

Maytag MFS25PN - Valve Repair; Water Distribution

Maytag MFS25PN
65 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
reducing
the
pressure in
the
plunger
area.
The
water
pressure
from
the
supply
forces
the
diaphragm
(H)
to
open
and
allows
the
water
to
run
under
the
diaphragm
through
the
outlet
of
the
valve.
When
the
predetermined
water
level is
reached,
the
solenoid
is de-energized
and
the
plunger
spring
(A)
pushes
the
plunger
(B)
back
into
the
diaphragm
opening.
Water is
forced
through
pilot
hole
(C)
until equal
pressure is attained
on
both
sides
of
the
diaphragm,
thus
stopping
the
flow
of
water
through
the
valve.
Some
of
the
valves
might
have a
flow
control
(F,E)
mounted
in
the
inlet
and outlet. This
flow
control
will
give
a
constant
flow
through
the
valve
independent
of
the
water
pressure.
Service
Tips:
If
the
valve
does
not
open
or
close, check
the
following:
Use
caution
when
working
with
live
circuits.
1.
Check
power
to
the
solenoid
- use
voltme-
ter. Check
for
abnormal
drop
in
voltage.
2.
Check
the
solenoid
for
short
circuit
or
failure in
the
coil.
3.
Check
that
the
water
pressure corre-
sponds
to
the
rated pressure
of
the valve.
4.
Check
the
filter
screen in
the
water
inlet
and
clean
if
necessary.
5.
Check
the
pilot
hole
in
the
diaphragm
to
be sure
it
is
not
closed
by
foreign
particles.
6.
Check
plunger
and
diaphragm
for
damage.
7.
Check
to
see
that
the
pilot
hole in
the
diaphragm
is
positioned
over
the
water
inlet
opening
in
the
valve body.
When
replacing
diaphragm,
see
that
the
pilot
hole
is in
the
correct
position.
8.
Make
sure
you
have
the
correct
replace-
ment
valve
for
the
model
you
are
servicing.
Valve Repair
In
most
cases,
only
the
diaphragms
require
replacement. Valve
diaphragm
kits
provide
a
means
for
quick
repair
of
these valves.
Disconnect
from
power
supply.
1.
Push
upward
on
the
base
of
the
solenoid
to
release
from
valve
guide
tube.
2.
Turn valve
guide
tube
to
gain access
to
diaphragm.
Water
Distribution
MFS50
models:
There are
two
inlets
for
water
in
the
ma-
chine: one
hot
and one cold.
The cold
water
connection
is
made
to
a
manifold
that
has the
following
valves
attached:
YV2
Cold fill (Inlet 2
when
programming
control
board)
YV5
Supply
1
YV6
Supply
2
YV7
Supply
3
YV8
Supply
4
YV9
Supply
5
YV10 Cool
down
The
hot
water
connection
is
made
to
a single
valve:
YV3
Hot
fill (Inlet 3
when
program-
ming
control
board)
Listed
below
are the
locations
for
the
flush
points
of
each valve:
Valve
Flush
Point
YV2 &
Supply
box
(lower
right
side,
below
YV3
supply
cups)
YV5
Supply
box
compartment
1 (far
left
side
of
supply
box)
YV6
Supply
box'compartment
2 (far
left
side
of
supply
box)
YV7
Supply
box
compartment
3 (far
left
side
of
supply
box)
YV8
Supply
box
compartment
4
(far
left
side
of
supply
box)
YV9
Supply
box
compartment
5
(far
left
side
of
supply
box)
YV10
Supply
box
(lower
right
side,
below
supply
cups)
16009607
Section
2.
Service Procedures
©1999
Maytag Appliances
Sales
Company
2-8