46 ALR 110F – 150F Product Manual ALR2-3
1.04 QUALITY ASSURANCE
A. Qualifications; Equipment manufacturer must specialize in the manufacture of the
products specified and have five years experience with the equipment offered.
B Regulatory Requirements: Comply with the codes and standards specified
C Chiller manufacturer must be ISO registered.
1.05 DELIVERY AND HANDLING
A. Chillers shall be delivered to the job site completely assembled and charged with
refrigerant and oil by the manufacturer. For remote evaporator applications the
equipment shall be shipped with a holding charge of refrigerant.
B. Comply with the manufacturers instructions for rigging and handling equipment.
1.06 WARRANTY
The refrigeration equipment manufacturer’s guarantee shall be for a period of one year from
date of equipment start up but not more than 18 months from shipment. The guarantee shall
cover defects in material and workmanship within the above period, excluding refrigerant.
PART 2--PRODUCTS
2.01 ACCEPTABLE MANUFACTURERS
A. McQuay International
B. (Approved Equal)
2.02 UNIT DESCRIPTION
Provide and install as shown on the plans factory assembled, factory charged, and factory
run tested, air-cooled reciprocating compressor packaged chillers in the quantity specified.
Each chiller shall consist of multiple accessible-hermetic reciprocating compressors, direct
expansion evaporator, air-cooled condenser section, control system and all components
necessary for safe and controlled unit operation.
2.03 DESIGN REQUIREMENTS
A. General: Provide a complete reciprocating packaged chiller as specified herein and
as shown on the drawings. The unit shall be in accordance with the standards
referenced in section 1.02 and any local codes in effect.
B. Performance: Refer to the schedule of performance on the drawings. The chiller
shall be capable of stable operation to a minimum of 17 percent of full load without
hot gas bypass. Performance shall be in accordance with applicable ARI Standard.