EasyManua.ls Logo

Mega H-550A - Foundation Layout and Set-Up; Foundation

Default Icon
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3.2 Foundation layout and set-up:
(1) Foundation:
The foundation should be constructed of reinforced concrete and must be level and flat. After the proper
leveling position has been obtained, anchor the machine with anchor bolts. The position of anchor bolts
and floor dimensions are shown in fig 4:
Contact portion with floor
Position of anchor bolts
Fig. 4
All leveling bolts should support the weight of the machine evenly .
3 2

Related product manuals