EasyManua.ls Logo

Mercury 25 4-Stroke - Top Cowl Removal and Installation

Mercury 25 4-Stroke
72 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MAINTENANCE
50
IMPORTANT: The engine must be run during flushing in order to open the thermostat and circulate water through
the water passages.
!
WARNING
To avoid possible injury when flushing, remove the propeller. Refer to Propeller Replacement, following.
1. Place the outboard in either the operating position (vertical) or in a tilted position.
2. Remove propeller. Refer to Propeller Replacement.
3. Thread a water hose into the rear fitting. Partially open the water tap (1/2 maximum). Do not open the water
tap all the way, as this allows a high pressure flow of water.
IMPORTANT: Do not run engine above idle when flushing.
4. Shift outboard into neutral. Start the engine and flush the cooling system for at least 5 minutes. Keep engine
speed at idle.
5. Stop the engine. Turn off the water and remove hose. Reinstall the propeller.
ob00367
Top Cowl Removal And Installation
REMOVAL
1. Unlock the rear latch by pushing lever down.
ob00368
2. Lift rear of cowl and disengage front hook.
ob00369
INSTALLATION
1. Engage the front hook and push cowl back over the cowl seal.
2. Push cowl down and move the rear latch lever up to lock.

Table of Contents

Related product manuals