EasyManua.ls Logo

Mercury 25 Jet 4-Stroke - Page 108

Mercury 25 Jet 4-Stroke
122 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ENGINE INSTALLATION
102
BOATS WITH A "V" BOTTOM HULL
1. Measure the width of the leading edge on the water intake
housing. Make a horizontal line on the transom up from the
"V" bottom the same length as the width of the water intake
housing.
a
b
22401
a - Horizontal line
b - Width of the leading edge on the water intake housing
2. Place (center) the outboard on the boat transom. Set the
height of the outboard on the boat transom so that the front
edge of the water intake housing is in line with the horizontal
line made in step 1. Temporarily clamp the outboard to the
transom at this position.
3. Fasten the outboard to the transom at this height. Refer to
Fastening the Outboard.
22403

Table of Contents

Related product manuals