EasyManua.ls Logo

Mercury 75 SEA PRO - Page 542

Mercury 75 SEA PRO
574 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7A-28 - ATTACHMENTS/CONTROL LINKAGE 90-830234R3 DECEMBER 1997
2. Apply marine sealer to shanks of mounting bolts
(not threads) and secure engine to transom with
4 bolts, flat washers and locknuts, as shown. Be
sure that installation is water-tight.
a
b
b
c
c
a
a - Mounting Bolt - 4-1/2 in. (11.4mm) long (4 Req.)
b - Flat Washer (4 Req.)
c - Locknut (4 Req.)
WARNING
Before operating, motor(s) MUST BE SECURED
to boat transom with four 1/2 diameter bolts and
locknuts, as follows: 2 bolts must be installed
thru upper mounting holes and 2 bolts thru lower
mounting holes, as shown in step 5. Installation
must be water-tight, and engine should be
checked for tightness on the transom during op-
eration. Failure to bolt engine to transom (using
4 bolts and locknuts, as shown in step 5) may re-
sult in damage to boat and/or loss of motor and
possible injury to occupants of boat.

Table of Contents

Related product manuals