EasyManua.ls Logo

Mercury 75 - Steering Cable - Starboard Side Routed Cable

Mercury 75
159 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2. Thread the lifting eye into the flywheel hub for a minimum of five turns.
15363
Lifting Eye 91‑90455‑‑1
2756
Threads into the flywheel to remove the
powerhead assembly from the
driveshaft housing, or to lift entire
engine for removal/installation.
3. Connect a hoist to the lifting eye.
4. Lift the outboard and place it on the boat transom.
Steering Cable ‑ Starboard Side Routed Cable
1. Lubricate the O‑ring seal and the entire cable end.
3724
95
Tube Ref
No.
Description Where Used Part No.
95
2-4-C with PTFE O-ring seal and entire cable end 92-802859A 1
OUTBOARD INSTALLATION
122 eng

Table of Contents

Other manuals for Mercury 75

Related product manuals