EasyManuals Logo

Metrohm 930 Compact IC Flex ChS/PP/Deg Manual - Short Instructions

Metrohm 930 Compact IC Flex ChS/PP/Deg
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #45 background imageLoading...
Page #45 background image
■■■■■■■■■■■■■■■■■■■■■■
4 Installation
930 Compact IC Flex ChS/PP/Deg (2.930.1360)
■■■■■■■■
37
3
Starting equilibration
Start the equilibration in MagIC Net: Workplace Run Equili-
bration Start HW.
Visually inspect whether all capillaries and their connections from
the high-pressure pump to the detector are leak-tight. If eluent is
leaking out anywhere, tighten the corresponding pressure screw
further, or loosen the pressure screw, check the end of the capil-
lary and shorten it using the capillary cutter if necessary and
retighten the pressure screw.
4
Conditioning the system
Continue rinsing the system with eluent until the desired stability
level for the baseline has been attained .
The instrument is now ready for measuring samples.

Other manuals for Metrohm 930 Compact IC Flex ChS/PP/Deg

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Metrohm 930 Compact IC Flex ChS/PP/Deg and is the answer not in the manual?

Metrohm 930 Compact IC Flex ChS/PP/Deg Specifications

General IconGeneral
BrandMetrohm
Model930 Compact IC Flex ChS/PP/Deg
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals