Grease the apron drive shafts, both sides of the
spreader by the grease lines, 5 pumps every 8 hours.
Figures 11 and 12.
Grease the axle at both sides of the spreader by
the grease lines, 10 pumps every 8 hours. Figures 11
and 12.
Maintain oil level in vertical beater gearbox to site
gauge level. It holds 18.5 Qts. When required, refill
with SAE 85-140 Moly Fortified gear lube or Synthetic
SAE 75-90 gear lube. Figure 12.
Grease cross bearings on yoke (both ends of
PTO shaft) 1 pump every 8 hrs. Grease telescoping
shaft through slot in center of guard, 4-5 pumps every
8 hrs. Figure 15.
Special attention should be paid to lubricating the
constant velocity PTO drive shaft assembly. See fgure 15.
Page 21 MODEL: VB750
FIGURE 14.
FIGURE 15. PTO LUBRICATION
CV CENTER HOUSING,
4 PUMPS EVERY 24
HRS. OF OPERATION
CV BALL & SOCKET, 1-2
PUMPS EVERY 8 HRS.