REGENCY 4 Modulek series boilers are manufactured to the highest standard of quality, per-
formance and safety in accordance with EC standards. The Regency 4 Modulek series boilers
carry the CE mark.
The installation of REGENCY 4 Modulek series boilers must be in accordance with the rele-
vant requirements of the Gas Safety (Installation and Use) Regulations 1994, Health & Safety
at Work Act, Building Regulations, I.E.E. Regulations, Construction (Design & Management)
Regulations 1994, Local Authority Byelaws, Local Gas Undertaking Regulations, Local &
National Water Byelaws, Fire Authority Regulations and Insurance Company requirements.
The following codes of practice are also applicable:
BS6880 Codes of practice for low temperature hot water heating systems of output greater
than 45 kW. Parts 1,2 & 3 : 1988.
CP342 Part 2 : 1974 Code of practice for centralised hot water supply.
BS6644 1991 specification for gas fired hot water boilers of rated inputs between 60 kW and
2 MW.
IGE/UP/2 Gas installation pipework, boosters and compressors on industrial and commercial
premises.
CIBSE Guide Reference sections B7, B11 and B13.
British Gas IM/11Flues for commercial and industrial gas fired boilers and air heaters.
It is the law that all gas appliances are installed by competent persons, i.e. Corgi Registered,
in accordance with above regulations. Failure to comply with regulations could lead to pro-
secution. It is in your own interest and that of safety, to ensure that the law is complied with.
The location chosen for the boiler must permit the provision of a satisfactory flue and an ade-
quate space for servicing and air circulation around the boiler. The boiler room, whether
specifically constructed or a modification of an existing space, should be designed in accor-
dance with BS6644.
The boiler house must be kept clean and the boilers must not be permitted to operate during
the installation of lagging materials or during dust making operations.
CONFORMITY STATEMENT
INSTALLATION REQUIREMENTS
GAS SAFETY (INSTALLATION AND USE) REGULATIONS
LOCATION