M‑I SWACO MONGOOSE PRO Shale Shaker
45 Field Installation and Operation Manual 9092F02001AENG (D) 45
19. RIG-DOWN / PREPARING EQUIPMENT FOR RELOCATION
To prepare a unit for rig down or relocation, ensure the following have occurred:
• Unit has been properly shut down (Refer to paragraph 14).
• Unit has been properly cleaned (Refer to paragraph 16).
• Screens have been removed (Refer to paragraph 15.3.1).
• Unit has been disconnected from fluid piping.
• Shipping brackets have been reinstalled (Refer to paragraph 10.2).
Once these steps are completed, the equipment is ready for transportation.