5 IMPORTANT INFORMATION REGARDING 
   REFRIGERANT USED
This product contains fluorinated greenhouse gases covered by the 
Kyoto Protocol. Do not vent gases into the atmosphere.
Refrigerant type:    R410A 
GWP
(1)
 value:        2088
(1)
  GWP = global warming potential
The refrigerant quantity is indicated on the unit name plate
6 SELECTING THE INSTALLATION SITE
Make sure there is enough room to do the installation
WARNING
1  Select an installation site where the following conditions
    are satisfied and one that meets with your customer's approval.
    - Places that are well-ventilated.
    - Places where the unit does not disturb next-door neighbors.
    - Safe places which can bear the unit's weight and vibration
      and where the unit can be installed at an even level.
    - Places where there is no possibility of flammable gas or product
      leak.
    - The equipment is not intended for use in a potentially explosive
      atmosphere.
    - Places where servicing space can be well ensured.
    - Places where the units' piping and wiring lengths come within the
      allowable ranges.
    - Places where water leaking from the unit cannot cause damage
      to the location (e.g. in case of a blocked drain pipe).
    - Places where rain can be avoided as much as possible.
    - Do not install the unit in places often used as a work space.
      In case of construction work (e.g. grinding etc.) where a lot of dust
      is created, the unit must be covered.
    - Do not place any objects or equipment on top of the unit (top
      plate)
    - Do not climb, sit or stand on top of the unit.
    - Be sure that sufficient precautions are taken in case of refrigerant
      leakage according to relevant local laws and regulations. 
2  When installing the unit in a place exposed to strong wind, pay
    special attention to the following.
    Strong winds of 5 m/sec or more blowing against the unit's air
    outlet causes a short circuit (suction of discharge air), and this
    may have the following consequences:
    - Deterioration of the operational capacity.
    - Frequent frost acceleration in heating operation.
    - Disruption of operation due to rise of high pressure.
    - When a strong wind blows continuously on the front of the unit,
      the fan can start rotating very fast until it breaks.
 
 
3  Prepare a water drainage channel around the foundation, to drain
    waste water from around the unit.
4 If water does not easily drain from the unit, mount the unit on a 
   foundation of concrete blocks, etc. (the height of the foundation 
   should be about 100 mm (3.93 in).
5 If you install the unit on a frame, please install a waterproof plate 
  (about 100 mm) on the underside of the unit to prevent water from 
   coming in from the low side.
6  When installing the unit in a place frequently exposed to snow,  
   pay special attention to elevate the foundation  as high as possible. 
.
 
■ Set the outlet side at a right angle to the direction of the wind.
Strong wind
Strong wind
Blown air
4
5/7/9 kW
In normal condition,refer to the figures below for installation of the 
unit:
The position of barycenter for different unit can be seen in the 
picture below.
10-16 kW
    In case of strong wind and the wind direction can be foreseen,refer 
    to the figures below for installation of the unit(any one is  OK):
■  Turn the air outlet side toward the building's wall, fence or screen.