Service Manual, 2016-12
10 / 39
3.Installation and commissioning
3.1Handling
1) Protect the refrigerator in moving it
Same as shown as left photo, please move it by
handcart with cushion
2) Remove all packing materials and bottom
cushion, then move into house for placement
3) After moving it to appropriate location, wait for
2 hours before power on.
3.2 Door Disassembly and Assembly(None)
The refrigerator door needs to be dismantled if it cannot enter the room in the whole.
3.3 Installation location
Location that is easy for ventilation shall be chosen
to facilitate heat dissipation, enhance its
performance and reduce the energy consumption.