6
| MIJAR WATER TREATMENT |
| Azotowa 15b | 41-503 Chorz Poland | Tel./fax. 32 2899674 | email: export@mijar.eu | www.mijar.eu |
1.3. Control function
Steering Valve
Before starting, you should program the time and frequency of regeneration.
The controller is factory programmed for regeneration at 2.00 at night, every sixth day.
Depending on water use and water hardness set the correct frequency of regeneration
2. Preparation for installation
2.1. Installation preparation plan
Picture 1.
On the purchaser’s
side:
1. Utility water
supply pipe (cold)
valve.
2. Drainage (sewer)
at a max. height of
100 mm,
connection DN
50.
3. Electric socket
230 V / 50 Hz, 16
A
4. Floor drainage
must be in the
room.
5. Sediment filter
should be use
before water
softener
2.2. Dismantling and utilization
The device is dismantled after it lifetime has expired (for final destruction or scrap).
The reversed assembly steps are to be commenced.
Note!
First clean the system thoroughly with fresh water and drain the tanks and pipes completely!
Comply with workplace safety instructions in this respect!
Different parts of the device must be utilized in accordance with binding regulations of
utilization and waste management!