EasyManua.ls Logo

Millipore Milliflex Plus - Pump Head Installation

Millipore Milliflex Plus
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12
• Decontamination
The hubs must be cleaned after each use. To
decontaminate the uid line hub and the tubing,
use the sanitizing mode of the Milliex
®
PLUS Pump
(refer to the Milliex
®
PLUS Pump User Guide). The
external parts of both hubs may be sprayed with
an alcohol solution or a standard laboratory surface
decontamination solution.
Hang the hubs inside the isolator during the
decontamination cycle as shown below.
3. Pump head installation
Push in the latch on the side of the pump head.
Place the pump head onto the mounting post, with the latch to the left, as you face
the pump, as shown.
Turn the pump head until it drops down and is fully in contact with the mounting post. The latch is
automatically released and locks the head in place. The latch should be positioned on the left side of
the pump assembly, when the head is locked in place.
NOTE: The pump head should be autoclaved before the rst use, as described in the Maintenance section.
Millipore
VHP
ON
C
OK
START
OFF
Mounting Post
Latch

Related product manuals