15
7. Initial Power-up
At installation, the steps described above (Hardware Installation) should have been performed,
as applicable, before conguration.
1. Switch the pump on by pressing the ON/OFF button on the keypad. The display shows the
following for a few seconds: Milliex
®
PLUS SERIAL N:
2. The following display appears: Manual
3. Press OK. The display will show: Tare
4. Press OK. The display shows: Remove expendable—press start
5. Remove anything on the pump head (e.g., cover or disposable) and press START.
The display shows: measuring..... please wait......
6. After a few seconds, the display will revert to the display manual testing. (Additional information on
the Tare procedure may be found in the Preparation for Testing section.)
8. Operation
A. Preparation for Testing
We recommend that the pump head be autoclaved before the rst use and after each workday.
See the Maintenance section.
Whenever the pump head is removed, the Tare cycle must be run (see below).
It is also recommended to sanitize the pump interior before the rst use and after each workday, and
if the pump is unused for more than a day. See Sanitizing below, in this section.
1. Install the pump head, as described in the Installation section. Run the Tare cycle, as described below.
2. To prepare for testing, switch on the pump, by pressing the ON/OFF button on the keypad.
For a few seconds, the display shows: Milliex
®
PLUS Serial N:
After the power-up display, the Main Program Screen for the previously selected program is displayed.
For example: Manual
B. Tare
The Tare procedure adjusts the measurement system in the pump for the positioning and removing of
the Milliex
®
funnels
1. When the display shows Tare, press OK. The display shows: Remove expendable. Press Start
2. Remove anything on the pump head (e.g., cover or disposable) and press START. The display shows:
Measuring… Please wait…
After a few seconds, the display returns to the Main Program Screen for the previously-selected program.
C. Sample Processing
1. Position a tray of Milliex
®
100 funnels with the Millipore name facing the operator.
2. Remove a funnel from its packaging tray. A notch in the tray is uncovered: this will facilitate picking
up the spacer.
3. Use sterile forceps to place the aseptic spacer on the pump head. Firmly press the funnel onto the pump head.
NOTE: Make sure that the base of the funnel is ush with the top of the pump head lter support.
4. Remove the cover from the funnel, while maintaining the funnel in position with the other hand.