30
Once the machine is in place and assembled this far, have the power and air supplies
connected by qualified personnel as described in chapter 1. See the safety checklist on
page 2 for qualifications
Level the machine (rough level) in both side to
side and front to back directions.
Install the auger chute (if equipped)
1. Remove the screws holding the auger
in to the coolant tank.
2. Raise the end of the auger so the chute
can be installed.
3. Install the chute, then replace auger
hardware.
Slide the flood coolant tank under from the
front of the machine.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Milltronics VM Series and is the answer not in the manual?

Milltronics VM Series Specifications

General IconGeneral
BrandMilltronics
ModelVM Series
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals