EasyManua.ls Logo

MIOX RIO H5 - User Manual

Default Icon
82 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
RIO SERIES ON-SITE GENERATOR
M1-M5 H1-H5
Installation, Operation, and Maintenance
Manual
March 26, 2019

Table of Contents

Questions and Answers

Summary

RIO Series OSG System and Ancillary Components

Electrolytic Cell

Describes the proprietary membrane-less cell producing oxidants and its pressure reaction.

Installation

SAFETY PRECAUTIONS AND WARNINGS

Crucial safety measures for installation, including codes, venting, and grounding.

Recommended Tools for Installation: RIO Series OSG

System Description

Electric Connections Required for Start-Up

Electrical Power Connection

Describes routing the power cable and connecting it to the switch gear compartment.

Control System;Rear Panel Connections

Plumbing Connections Required for Startup

Feed Water Connection

Details feed water requirements, pressure, and flow control for the OSG.

Brine Feed Connection

Oxidant Discharge

Brine Pressure Boost System Installation (Optional)

Oxidant Storage Tank Installation

Feed Line Connection;Injection System

Cell Installation and Removal

Removal

Step-by-step procedure for removing the OSG cell safely.

Installation

Step-by-step procedure for installing the OSG cell correctly.

Electrical Connections

Cell Lead;Bussbar Connection

Details how to connect cell leads to buss bars using electric joint compound.

Plumbing Connections

Operations

Safety Precautions and Warnings

Essential safety warnings for operating the OSG, including solution use and venting.

Initial Settings and Startup Checks

Steps for initial electrical check and filling the brine generator with salt.

Checks Prior to Startup

Brine Boost Operation

Water Softener Operation

Routine Operations

Startup Sequence;Operating Window

Operation Controls

Fault Conditions

Water Flow Control Valve Reset Procedure

System Shutdown procedure

General Periodic Maintenance

Daily Maintenance

Daily checks including salt level and initial operation monitoring.

Weekly Maintenance

Monthly Maintenance

Quarterly Maintenance

Annual Maintenance

Electrolytic Cell Replacement

Troubleshooting Guide

Procedures

Brine Pump Replacement

Detailed steps for removing and installing a new brine pump.

Removing The Old Brine Pump

Step-by-step instructions for safely removing the existing brine pump.

Installing the New Brine Pump

Rupture Disk Maintenance

Replacing the Rupture Disk Diaphragm

Procedures for safely replacing a ruptured rupture disk diaphragm.

Rupture Probe Maintenance

Acid Washing the Cell

Oxidant Demand Testing

Setup Calculations

Procedure

Oxidant Demand Determination

Chlorine Production Testing

Preparing Chlorine Demand-Free Water

Methods for preparing demand-free water essential for accurate testing.

Measuring Chlorine Concentration

Measuring Flow

Calculating Total Chlorine Production

Formulas to calculate daily chlorine production based on concentration and flow.

MIOX RIO H5 Specifications

General IconGeneral
BrandMIOX
ModelRIO H5
CategoryPortable Generator
LanguageEnglish

Related product manuals