EasyManua.ls Logo

Mitsubishi PUHZ-P200YHA - Test Point Diagram

Mitsubishi PUHZ-P200YHA
96 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
54
Communication power supply
D71 Voltage
24V DC
CNS
S1-S2:220-240V AC
CNAC
2 to 4: Power supply for
outdoor controller circuit
board (220V-240V AC)
1 to 3: Power supply for
indoor and outdoor unit
connection wire
(220-240V AC)
CNF1, CNF2
Connect to the fan motor
1-4: 250-330V DC
5-4: 15V DC
6-4: 0-6.5V DC
7-4: 15V DC (When stopped)
7.5V DC (When operated)
(0V-15V pulse)
21S4
Four-way valve
63H
High pressure
switch
CN4
Transmission to out-
door power circuit
board (CN4)
SW4
Test operation
SW6
Model select
SW5
Function switch
SW1
Forced defrost, detect history record reset,
refrigerant address
CNDM
1 to 2:
Input of low-level
sound priority mode
1 to 3:
Input of external con-
tact point
TH4
Thermistor
<Discharge>
TH3
Thermistor
<Outdoor pipe>
TH7/6
Thermistor
<Outdoor/
2-phase pipe>
CNDC
Connect to the outdoor
noise filter circuit board
(CNDC)
+
V
FG
(TEST POINT 4)
(Voltage between
right pins of PC5C
and PC5D, pin 3
and pin 4)
(Same as
(CNF1
7(+)-4(-))
VSP
(TEST POINT 3)
(Voltage between pins
of C5A, C5B): DC 0V
(when stopped), DC 1–
6.5V
(when operated)
SW7
Demand control setting
CN51
External signal output
• Compressor operating
signal
• Abnormal signal
LEV-A
Linear expansion
valve
SWP
Pump down
SW8
Wiring replace
CNM
Connect to A control
service tool
CNMNT
Connect to
M-NET adapter(CN5)
CNVMNT
Connect to
M-NET adapter(CND)
CN2
Connect to the outdoor
power circuit board (CN2)
1-5: Reception from
power circuit board
2-5: Zero cross signal
(0-5V DC)
3,4: Not used
6-5: 16V DC
7-5: 16V DC
11-9. TEST POINT DIAGRAM
Outdoor controller circuit board
PUHZ-P200YHA PUHZ-P250YHA PUHZ-P200YHA3 PUHZ-P250YHA3
PUHZ-P200YHA3R1 PUHZ-P250YHA3R1 PUHZ-P200YHA3R2 PUHZ-P250YHA3R2
PUHZ-P200YHA3R3 PUHZ-P250YHA3R3
<CAUTION> TEST POINT1 is high voltage.

Related product manuals