EasyManua.ls Logo

Mitsubishi SRK35ZS-S

Mitsubishi SRK35ZS-S
335 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Max. 12 minutes and 50 seconds
Defrost operation
Heating operation
Depends on an operation condition, the time can be longer than 7 minutes.
2~7 minutes
Hot keep operation
-20
-20 -15 -10 -5 0 5 10
-15
-10
-5
0
Outdoor air temperature ()
Outdoor heat exchanger temperature ()
Defrost operation
start
Defrost operation start temperature
(i)
(ii)
(iii)
Tho-R
Tho-R
Tho-R
minutes
2
2
20
º
(v)
(i)(ii) (iii) (v)
(b) Ending conditions
Max. 12 minutes and 50 seconds
Defrost operation
Heating operation
Depends on an operation condition, the time can be longer than 7 minutes.
2~7 minutes
Hot keep operation
-20
-20 -15 -10 -5 0 5 10
-15
-10
-5
0
Outdoor air temperature ()
Outdoor heat exchanger temperature ()
Defrost operation
start
Defrost operation start temperature
(a) Capacity control
(i) Indoor unit SRK
**
ZMX-S models only
Model
Capacity
SCM40ZS-S
SCM45ZS-S
SCM50ZS-S
Capacity control is within the range shown above. If demand capacity of the indoor units exceeds the maximum capacity
of the outdoor unit, the demand capacity will be proportionally distributed.
Model
Capacity
SCM40ZS-S
SCM45ZS-S
SCM50ZS-S
SCM50ZS-S
1.8
6.9 kW
Model
Capacity
SCM40ZS-S
1.5
5.8 kW
SCM45ZS-S
1.5
6.3 kW
(ii) Indoor unit except SRK
**
ZMX-S and SKM
**
ZSP-S models
(ii) Indoor unit SKM
**
ZSP-S models only
7.5.2 Outline of cooling operation
(1) Summary
-
190
-