EasyManua.ls Logo

MK MK-100 - Setup and Operation Preparation; Pre-Start Inspection

MK MK-100
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
20
Prior to beginning work, a pre-start inspection of the saw should be performed.
(A)
Ensure the ON/OFF Switch
is in the OFF position.
(B)
Verify the Movable Cutting
Table moves freely.
(C)
Inspect the Diamond Blade for
damage. Verify the blade is cor-
rect for the material being cut.
PRE-START INSPECTION
(D)
Inspect the Pump Assembly
for damage. Ensure the cord
is free of cracks or cuts.
(E)
Inspect the MK-100 for
damage. Ensure the cord is
free of cracks or cuts.
MK-100 TILE SAW SETUP

Related product manuals