APPLICATION SPECIFICATION
REVISION: ECR/ECN INFORMATION: SHEET No.
EC No:
ABC2001-9999
1
DATE:
2008/16/03
TITLE:
MX150 Application Guide
60 of 62
DOCUMENT NUMBER: CREATED / REVISED BY: CHECKED BY: APPROVED BY:
Brian Zelinski Steve Verzyl Scott Marceau
TEMPLATE FILENAME: APPLICATION_SPEC[SIZE_A](V.1).DOC
Section 10: Packaging
Assembly at Tier 1(Wire Harness Assembly Plant)
Unpacking:
TPA as received, The TPA are locked in place in the pre-lock position. If the TPA is in final
lock follow the service section in section 5.
Handling in Plant:
Harness build board/fixture: Molex recommends moving the cell pack box or box to the line,
this will insure against damage. Parts should remain in Molex cell pack until assembled placed
on a harness assembly build board.