EasyManua.ls Logo

molex MX150 - Section 10: Packaging; Revision: Ecr;Ecn Information: Title

molex MX150
62 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
APPLICATION SPECIFICATION
REVISION: ECR/ECN INFORMATION: SHEET No.
EC No:
ABC2001-9999
1
DATE:
2008/16/03
TITLE:
MX150 Application Guide
60 of 62
DOCUMENT NUMBER: CREATED / REVISED BY: CHECKED BY: APPROVED BY:
AS
-
33472
-
100
Brian Zelinski Steve Verzyl Scott Marceau
TEMPLATE FILENAME: APPLICATION_SPEC[SIZE_A](V.1).DOC
Section 10: Packaging
Assembly at Tier 1(Wire Harness Assembly Plant)
Unpacking:
TPA as received, The TPA are locked in place in the pre-lock position. If the TPA is in final
lock follow the service section in section 5.
Handling in Plant:
Harness build board/fixture: Molex recommends moving the cell pack box or box to the line,
this will insure against damage. Parts should remain in Molex cell pack until assembled placed
on a harness assembly build board.