EasyManua.ls Logo

Mooney M20K - Engine Ground Operation Checkout; Engine Set Up Procedure

Mooney M20K
437 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SERVICE
AND
MAINTENANCE
MANUAL
M20K
MOONEY
AIRCRAFT
CORPORATION
L.
ABemator
and
standby
generator
(if
installed)
control
at
FULL
RICH,
and
maintain
RPM
in
the
1000
win’ng
is
secure.
to
1200
RPM
range
during
warmup
and
ground
run.
M.
Exhaust
system
is
secure.
A.
Warmup
engine
until
temperature
indications
N.
Vacuum
lines
and
connections
are
secure.
are
normal.
Monitorcylinder
head
and
oil
temperature
instruments
for
overtemperature.
O.
Fuel
connedions
are
tight
and
pressure
checked.
B.
Check
magnetos
at
1800-2000
RPM
with
P.
Manifold
pressure
lines
are
tight.
propeller
at
high
RPM
blade
angle.
Switch
Q.
Oil
pressure
lines
are
tight
and
pressure
checked.
ignition-starter
switch
from
BOTH
to
LEFT
to
check
mag
drop.
Switch
back
to
BOTH
until
RPM
returns
to
R.
Fuel
injection
lines
are
tight
and
pressure
checked,
normal.
Switch
from
BOTH
to
RIGHT
and
check
mag
S.
Oil
filter
is
installed
and
secure.
drop.Retum
switch
to
BOTH.
Mag
drop
should
not
T.
Induction
manifolds
are
secure.
exceed
150
RPM
on
either
magneto
(drop
should
be
within
50
RPM
of
each
other).
A
smooth
drop
off
past
U.
All
lines,
hoses,
and
wires
are
properly
anchored,
normal
is
usually
a
sign
of
too
lean
or
too
rich
mi~dure.
V.
Induction
air
filter
is
installed
and
secure.
If
no
drop
in
RPM,
check
for
open
or
broken
P-leads.
W.
Engine
area
is
free
of
loose
objects,
tools,
etc.
71-0050
ENGINE
SET
UP
PROCEDURE
X.
Cowling
is
installed
and
secure
(See
Section
71-11).
FOR
TS10360-GB,
IB,
NIB,
SE
Y.
Cowl
flap
control
rods
are
conneded.
It
is
recommended
that
the
TSIO-360-GB,-LB,
-MB
or
-SB
engine
installed
on
Mooney
M20K
aircraft
be
set
7190-40
ENGINE
GROUND
OPERATION
up
according
to
the
following
instructions
in
conjundion
CHECKOUT
with
Teledyne
Continental
Motow
Operator’s
Manual
1.Prestarting
procedure
(with
aircraft
headed
into
wind):
and
appropn’ate
Service
Bulletins
CTCM
SE
M89-10
and
subsequent
issues).
There
are
several
steps
A.
Tum
ignition
switch
OFF.
required
to
ensure
proper
setup
of
engine
in
all
B.
Check
magneto
ground
connections.
operating
ranges.
C.
Check
engine
oil
level,
i.
Maten’alsTTools
Required:
D.
Check
fuel
quantity.
A.
Ground
support
equipment
kit
PIN
GSE
E.
Operate
all
controls
through
full
range
to
check
030027-501.
for
binding.
B.
Miscellaneous
hand
tools.
Required
for
I=.
Check
baffles
and
cowling
for
security.
adjustment
and
to
disconnect
or
conned
frttings
and
hoses.
G.
Open
cowl
flaps;
check
operation.
Single
cowl
flap
on
25-1000
and
ON.
C.
Safety
wire.
H.
Drain
fuel
sumps
and
gascolator;
check
for
D.
Ty-rap
and
installation
tool.
sediment
and
water.
E.
Pressure
gauge,
with
pressure
source
(sqeeze
I.
Place
wheel
chocks
and
set
parking
brake,
bulb)
for
leak
checks
pn’or
to
connection
of
calibrated
2.
Starting
procedure:
gauges
to
aircraft
systems.
A.
Set
propeller
govemor
control:
FULL
FWD.
2.
Procedures
for
Calibrated
Gauges
Connections.
(HIGH
RPM).
A.
Reference
Figure
71-1
for
location
of
B.
Turn
fuel
valve
ON.
connections
on
the
TSIO-360-GB
or
-LB
engine
and
Figure
71-4B
for
the
-MB
or
-SB
engine.
C.
Set
mi~dure
control:
FULL
RICH.
B.
On
aircraft
S/N
250247
thru
25-0835
there
are
D.
Open
throttle
FULL.
Push
primer
for
3-5
firewall
fittings
installed
which
can
be
used
for
routing
seconds
or
use
"HI
BOOST"
until
positive
indication
of
test
gauge
lines
into
the
cabin.
S/N
25-0836
and
ON
fuel
flow
is
obtained.
Retard
to
1/4
open.
have
an
access
cover
on
footwell.
This
cover
can
be
E.
Clear
propeller
area.
removed
and
a
fitting
adapter
cover,
Pn\l
050006-501,
installed
during
engine
set
up
to
allow
hoses
to
be
F.
Start
engine.
Check
oil
pressure.
If
no
oil
routed
dun’ng
adjustment
procedures.
The
adapter
pressure
is
indicated
within
30
seconds,
shutdown
cover
is
available
thru
Mooney
Service
Centers
as
part
engine
and
trouble
shoot
oil
system.
Refer
to
TCM
of
GSE
030027
kit
of
step
1,
A.
maintenance
publications
for
procedures.
G.
Set
throttle
for
idle
at
900
to
1000
RPM
for
one
C.
Installation
ofTest
Gauges
minute;
then,
advance
throttle
slowly
to
1200
RPM
for
1.
S/N
25-0001
thru
25-0999
Remove
cap
from
the
engine
warmup.
unmetered
fuel
tee
on
the
right
side
of
the
throttle
3.
Ground
run
and
warmup.
Always
head
aircraft
into
body.
S/N
25-1000
3
ON
Disconnect
the
unmetered
fuel
line
on
n’ght
side
of
the
throttle
body.
Install
a
tee
the
wind
dun’ng
warmup.
Always
select
the
high
RPM
blade-angle
setting
when
ground
running
engine.
a"d
Short
length
of
hose
to
reconnect
the
line.
Never
idle
for
e~dended
periods
at
low
RPM
(low
RPM
Install
a
0
to
60
PSI
calibrated
pressure
gauge
using
will
foul
spark
plugs).
Always
operate
with
m~ture
suitable
length
of
hose.
71-00-40
OLDWILLWAYNE

Table of Contents

Other manuals for Mooney M20K

Related product manuals