EasyManua.ls Logo

MRC FH-10A - Page 11

MRC FH-10A
35 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MRC Ltd
11 http://www.mrclab.com/
M10 to fasten the screws and nuts. Make sure the base cabinet is well connected
with the main body.
Picture 8
1.5.8. Installation of water tap and gas tap
Insert the work table and mount the water sink on the reserved sink hole.
Connect the laboratory water pipe and gas pipe (inflow) with the lower end of the taps.
Pass the drainpipe (provided) through the reserved hole at the side of the base cabinet
(refer to Picture 10) and connect it with the sewer pipe in the laboratory room (water
sink and drainpipe have been connected in factory)
Picture 9
Water sink
Water tap
Four screws to secure
the base cabinet to the
main body