M120
3Transport,inspectionandstorage
3.1Transport
Figure3.1Handles
Ifpossible,useapalletloadertomovethedehumidier.Usethetwohandlesinthecasingtoliftit(see
8.3,Technicaldataforweightdata.)
Usetheoriginalpackagingwhenshippingtheunit.
3.2Inspectionofdelivery
1.Inspectthedeliveryandcomparewiththedeliverynote,orderconrmationorotherdelivery
documentation.Makesurethateverythingisincludedandnothingisdamaged.
2.ContactMuntersimmediatelyifthedeliveryisnotcompleteinordertoavoidinstallationdelays.
3.Iftheunitistobeputintostoragepriortoinstallation,seesectionStoringtheequipment.
4.Removeallpackagingmaterialfromtheunit,andmakesurethatnodamagehasoccurredduring
transportation.
5.AnyvisibledamagemustbereportedinwritingtoMunterswithin5daysandpriortoinstallationof
theunit.
6.Disposeofthepackagingmaterialaccordingtolocalregulations.
3.3Storingtheequipment
Followtheseinstructionsifthedehumidieristobestoredpriortoinstallation:
■Placethedehumidierinanuprightpositiononahorizontalsurface.
■Re-usethepackagingmaterialtoprovideprotectionfortheunit.
■Protectthedehumidierfromphysicaldamage.
■Storethedehumidierundercoverandprotectitfromdust,frost,rainandaggressivecontaminants.
5Transport,inspectionandstorage190TGB-1008-H1402