EasyManua.ls Logo

Munters MX2 60 - 7.2 Fault tracing list, dehumidifier

Munters MX2 60
68 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6.8 Maintenanceofsteamreactivationheater
Adjustment, maintenance and re pairs should only be carried out by qualied personnel who are awa re of the
hazards of operating and maintaining equipment operating with high voltages and high steam temperatures.
Before atte m p ting to carry out a ny ins p e ction or maintenance in the heater compartment, the reactivation
heater must be allowed to cool down.
The following must be carried out before the dehumidier is re-started:
1. Examine all ductwork and duct insulation for cor rect connection and for general signs of damage and
leaks.
2. Examine the steam connections to ensure that all pipes are correctly installed and secured.
Serviceinterval Servicework
Makesurethatcorrectpressureisindicatedonthemanometer.Weekly
Examineallsteamconnectionsforleaks.
Examinetheheatercompartmentforsignsofcorrosionandscalebuild-up.
Allsignsofcorrosionmustbetreatedimmediately. Anyscaledepositsordirtaccumulated onthe
bottomoftheheatercompartmentshouldberemoved.
Monthly
Makesurethattheelectrical connectionsforthemodulatingvalvearesecure.
Examinethemodulatingvalve. Refertomanufacturer'stechnicaldocumentation.Six-monthly
Examine allnned surfaces forcorrosion. Repair ifnecessary.
Annually Draintheheater. Examinethewaterforminutemagneticdeposits.
Table 6.3 Periodic maintenance for steam heater unit.
190TEN–108 9–G1412
Serviceandmaintenance
41

Table of Contents

Related product manuals