EasyManua.ls Logo

Nautyl PHCP80 - Operation Instructions; Control Panel Overview

Default Icon
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9
bottom, please pay attention to it. Please hold the drainage nozzle (accessory) into the
hole and clip it well, and then connect a pipe to drain the condensation water out.
B
Wiring
1-Connect to appropriate power supply, the voltage should comply with the rated
voltage of the products. Bond the machine well to earth.
2-Wiring must be handled by a professional technician according to the circuit
diagram.
3-Set GFCI (Ground fault circuit interrupter) protector according to the local code for
wiring (leakage operating current 30mA).
4-The layout of power cable and signal cable should be orderly and not affecting each
other.
C
Switch on after finishing all wiring construction and re-checking.
VI. Operation Instruction
Picture for keys

Related product manuals