EasyManua.ls Logo

Navman Qube 300 - Essential Installation Tools and Supplies; Basic Tools for Installation; Essential Installation Supplies

Navman Qube 300
18 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Qube 300 | Installation Manual
7
The installation location must:
be a rigid surface or a large wiring loom, where the Qube 300 can be firmly secured
be dry
allow MDT/M-Nav or other peripheral device connections
allow the diagnostic LEDs on the Qube 300 to be seen
not be subject to excessive vibration or excessive heat
not be visible to the driver
The final orientation of the Qube 300 after installation is not important.
The following locations within the vehicle may be suitable:
inside or underneath the dash
in the boot/trunk area
CAUTION
Ensure that any holes that need to be drilled in the vehicle will not weaken the vehicle structure or
compromise the safety of the vehicle or its occupants. If in doubt, consult the vehicle manufacturer.
If mounting holes are required, use grommets to ensure that the vehicle remains waterproof.

Other manuals for Navman Qube 300

Related product manuals