Chapter 2 System Architecture
NEAX2000 IPS
Request For Proposal (RFP) Reference Guide Page 2-9
NDA-24349 Issue 4
Cabling
The internal and external cabling for the NEAX 2000 IPS is as follows:
Internal Cabling
BUS Cable
The BUS Cable provides a connection between PIMs for I/O Bus, PCM Bus, and Alarm Bus extension
in a multiple-PIM configuration.
Bus Cable
Name Code Qty Remarks
48-TW-0.7 CONN CA (No. of PIM)-1 0.7 m (2.3ft.)
Power Control Cable
The Power Control Cable provides a connection between the MP and the AC/DC Power Supply for
controlling battery backup function and MJ/MN alarm indication.
Power Control Cable
Name Code Qty Remarks
PWR CNT CA-D 1/PIM Power control cable (for PIMI-PIM7):
BWB - PZ-PW121/122 (Included in
PIM)
PWR CNT CA-E 1/PIM Power control cable (for PIM0)
BWB - PZ-PW121/122 (Included in
Base and PIM for Dual System)
DC Power Cable
The DC Power Cable provides a connection between the AC/DC Power Supplies for extending the 27
VDC input in a multiple-PIM configuration, when battery backup option is required
.
Power Cable (Internal Battery Option)
Name Code Qty Remarks
PWR CA-A 1/2 PIM DC Power Cable (-27v input)
BATT CA INT 1/PIM Internal Battery Cable
Power Cable (External Battery Option)
Name Code Qty Remarks
PWR CA-A (No. of PIM) –1= up to 4PIM
(No. of PIM) –2= 5 to 8PIM
DC Power Cable (-27v input)
BATT CA EXT 1/Stack External Battery Cable

Table of Contents