EasyManua.ls Logo

NEC NP-17CU01 - Names of the Projector Parts

NEC NP-17CU01
82 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
22
1. What’s in the Box? and the Names of the Projector Parts
1-3-4. Chiller unit (NP-17CU01)
11
12
10
9
8
7
6
5
4
3
1
2
13
13
1. Coolant inlet of chiller
Connects to the attachment port (OUT) of the projector using the hose for the chiller unit. Request your dealer/distributor
to attach or detach the hose.
2. Coolant outlet of chiller
Connects to the attachment port (IN) of the projector using the hose for the chiller unit. Request your dealer/distributor to
attach or detach the hose.
3. Filler inlet for coolant
Replenishes the cooling fluid.
4. Coolant owmeter
Allows you to check the cooling fluid level.
5. Drain port (Inside)
Drains the cooling fluid.
6. Air outlet
The air outlet to exhaust heat inside the projector. Do not cover.
7. AC power inlet
Connects the AC power cord. The AC power cord is not included. Request your dealer/distributor to attach or detach the
AC power cord.
8. Connector for communication line (RJ-45)
Connects the control cable in order to monitor the state of the chiller unit from the projector and control ON/OFF.
9. Keyhole
10
. Emergency stop switch (AC power switch)
Allows you to immediately stop the chiller unit (emergency stop state) by turning the switch when a malfunction occurs while
the projector or chiller unit is in operation, or in the case of an emergency (a person enters the laser irradiation range,
earthquake, fire, etc.). In the emergency stop state, the projector switches to the standby state.
11
. Controller
Displays the chiller unit temperature.
12
. Status display
Displays operating state and error status of the chiller unit.
13
. Air inlet
Draws in external air to prevent the chiller unit from internal overheating. Do not block.

Other manuals for NEC NP-17CU01

Related product manuals