SL1000 Getting Started Guide
10
Before Installation
Installation Procedure
1. Unpack all items and
check for damaged o
missing parts.
2. Are you are replacing an
existing telephone system
(Aspila Topaz, Xn120 o
IPC100) ???
3. Mount the SL1000 system
on the wall.
4. Connect the Telephones.
5. Connect the Trunk Lines.
8. Connect the AC Cord and
Switch on the SL1000 system.
9. Test the System.
7. Secure the Cables.
10. Configure the SL1000
System to the customer’s
requirements.
11. Install Optional Items.
6. Consider the operation
during power failure.