EasyManuals Logo

Net Optics Gig Zero Delay Tap User Manual

Default Icon
20 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #7 background imageLoading...
Page #7 background image
Gig Zero Delay Tap & 10/100/1000BaseT Tap
4
About This Guide
This guide explains how to install the Gig Zero Delay Tap and the
10/100/1000BaseT Tap. Please read the Guide before attempting to install
the device.
This guide covers the following models:
TP-CU3-ZD 10/100/1000 Tap with Zero Delay
TP-CU3-ZD-DC 10/100/1000 Tap with Zero Delay, -48V DC power
TP-CU3 10/100/1000 Tap
TP-CU3-DC 10/100/1000 Tap , -48V DC power
Unpacking and Inspection
Carefully unpack the Gig Zero Delay Tap and check for damaged or missing
parts. The Tap ships with the following:
(1) Tap device
(2) power supplies (TP-CU3-ZD and TP-CU3 only)
(2) power cords (TP-CU3-ZD and TP-CU3 only)
(1) retainer clip (TP-CU3-ZD and TP-CU3 only)
(1) network cable, 3 meter, straight-through (purple)
(1) network cable, 3 meter, cross-over (green)
(2) monitor cables, 3 meter, straight-through (purple)
(1) Installation Guide
You may have also ordered a panel for rack mounting and an extended warranty.
Carefully check the packing slip against parts received. If any part is missing or
damaged, contact Net Optics Customer Service immediately.
Warning! ____________________________________________________________
For the TP-CU3-ZD and TP-CU3 models, use only the power supplies pro-
vided by Net Optics for use with this product. Use of other power supplies may
result in a safety hazard that could cause damage or injury.
_______________________________________________________________________

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Net Optics Gig Zero Delay Tap and is the answer not in the manual?

Net Optics Gig Zero Delay Tap Specifications

General IconGeneral
BrandNet Optics
ModelGig Zero Delay Tap
CategoryNetwork Accessory
LanguageEnglish