T E C H L I N E A S D E S I G N G U I D E
NETAFIM @BCL@C40BDC65.doc 21/12/2009 38
TECHLINE AS™ SYSTEM INSPECTION CHECK LIST:
Project Name:
………………………………………………………………Date:…………………
Dripper Spacing 0.3m 0.4m 0.5m
Dripperline Spacing 0.3m 0.4m 0.5m Other m
Dripper Flow Rate 1.6 LPH 3.0 LPH
Application Rate
mm/hr
Installation Type Under Mulch Sub-surface Depth Below Grade mm
Station Program Run Time Flow Rate End Line Press
Number Number (Minutes) (L/M) (KPA)