Type of cable... Part number and length Connector type For...
Micro-USB console cable Not applicable Console connection during
software setup
Power cables Not applicable Powering up the system
5. Download and complete the
Cluster configuration worksheet
.
Cluster Configuration Worksheet
Installing the hardware
You need to install your system in a 4-post rack or NetApp system cabinet, as applicable.
Steps
1.
Install the rail kits, as needed.
Installing SuperRail into a four-post rack
2. Install and secure your system using the instructions included with the rail kit.
Note: You need to be aware of the safety concerns associated with the weight of the system.
24 SSDs
119.2 lbs (54.2 kg)
48 SSDs
132.4 lbs (60.2 kg)
3. Attach cable management devices (as shown).
4. Place the bezel on the front of the system.
Installing the hardware
5