Do you have a question about the Newmac CL 170C and is the answer not in the manual?
Specifies minimum distances from furnace to combustible materials for safe installation.
Procedure to test the WMO-1 blocked vent switch function.
Procedure for starting a new fire with coal, including draft and loading.
Specific procedures to follow during a power failure for safe operation.
Requirements for gas piping installation according to codes and ordinances.
Guidelines for ensuring adequate combustion air supply.
Loading...