SERHT50NA A0808
Section 5 . . . . . . . . . . CALIBRATION AND OPERATION VERIFICATION
• Introduction
• Test Equipment Required
• Pre-Test Inspection
• Front Panel Test / Alarm Check
• System Leak Test
• Pressure Transducer Calibration
• Pressure Meter Calibration
• Volume Factor Calibration
• Pressure Relief Valve Calibration
• Exhalation Valve Calibration
• Operational Set-Up (Standard Test Settings)
• Pressure Verification
• P trig
• PEEP / CPAP
• Pressure Control
• Exhalation Valve Sealing
• Manual Inflation
• High Paw Alarm
• Low Paw Alarm
• Check Prox Line Alarm
• Battery Test
• Humidifier (for HT50-H)
• OVP Test Record
Section 6 . . . . . . . . . . MAINTENANCE PR
OCEDURES
• Introduction
• Tools Required
• Parts Required
• Routine Maintenance Procedure
• Annual Maintenance Procedure
• 10,000 Hour Maintenance Procedure
Section 7 . . . . . . . . . . TR
OUBLESHOOTING
• Introduction
• Mechanical and Pneumatic Troubleshooting
• Electronic Troubleshooting