EasyManua.ls Logo

Newport HT50 - Page 79

Newport HT50
123 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SECTION 6
SERHT50NA A0808 6-5
Burn-in Test
WARNING The ventilator is a critical life support device. Upon
replacement of any critical assembly, it is important to complete
a 24 hour burn-in to assure proper operation.
1. To complete the burn-in test, set the ventilator to the Standard
Test Settings detailed in Section 5.
2. Let the ventilator operate for 24 hours.
Operational Verification Procedure
Upon completion of the Burn-in test, perform all calibrations and
Operation Verification Procedures as detailed in Section 5.

Table of Contents

Related product manuals