EasyManua.ls Logo

NexTraq VT-2200 - Post-Installation Testing

NexTraq VT-2200
17 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
13
Fig. 8 - VT-2200 Placement
Connect the radio, GPS and power cables to VT-2200. Wrap any extra
cable neatly with tie-wraps or electrical tape. Replace any paneling
or molding that was removed in the running of any antenna wires or
power cable.
Fig 9 – VT-2200 Mounting
Post-Installation Testing
VT-2200 registers in the NexTraq platform when radio, GPS coverage and
ignition are switched on. A determination whether the unit is in