23.
Connect the connector on the reactor. Click the en-
closed cables into place, two orange cables (T52
and T62) and one yellow cable (T51) on the circuit
board. Gather the cables in the nearest grey mount.
24.
Reinstall the control board PWB1 and all its connect-
ors. Secure the control board with the four screws.
25.
Supply first AMS 10-8 / F2040-8 and then
VVM / SMO with power.
| GB16