Checklist: Checks before commissioning
CheckedNotesRefrigerant system
Pipe length
Height difference
Pressurization test
Leak testing
End pressure vacuum
Pipe insulation
CheckedNotesElectrical installation
Property's main fuse
Group fuse
Load monitor / current sensor (Connects
to indoor module / control module.)
KVR 10
When installing AMS 10-6 / HBS 05-6,
check that the software version of the in-
door module/control module is at least
v8320.
CheckedNotesCooling
Pipe system, condensation insulation
7Chapter 1 | Important informationAMS 10