Inspection of the installation
Current regulations require the heating installation to be inspected before it is commissioned. The inspection must
be carried out by a suitably qualified person. Fill in the page for information about installation data in the User
manual.
DateSignatureNotesDescription
Heating medium (page 20)
System flushed
System vented
Particle filter
Shut-off and drain valve
Charge flow set
Electricity (page 22)
Fuses property
Safety breaker
Earth circuit-breaker
Heating cable type/effect
Fuse size, heating cable (F3)
Communication cable connected
F2120 addressed (only when cascade
connection)
Connections
Main voltage
Phase voltage
Miscellaneous
Condensation water pipe
Insulation condensation water pipe,
thickness (if KVR 10 is not used)
NOTE
Check the connections, main voltage and phase voltage before the machine is started, to prevent damage
to the heat pump electronics.