SCHEDULING
all
mon
tues
wed
thur
fri
sat
sun
activated
schedule 2schedule 1
SCHEDULING HOT WATER 2.3
normal
Activated
Schedule
Time period AdjustingDay Conflict
What hot water comfort the heat pump is
to work with can be scheduled here for up
to two different time periods per day.
Scheduling is activated/deactivated by
ticking/unticking"activated". Set times are
not affected at deactivation.
Schedule: The schedule to be changed is
selected here.
Activated: Scheduling for the selected
period is activated here. Set times are not
affected at deactivation.
Menu
2.3
Day: Select which day or days of the week the scheduling is to apply to here.
To remove the scheduling for a particular day, the time for that day must be reset
by setting the start time to the same as the stop time. If the row "all" is used, all
days in the period are set according to that row.
Time period: The start and stop time for the selected day for scheduling are se-
lected here.
Adjustment: Set the hot water comfort that is to apply during scheduling here.
Conflict: If two settings conflict with each other, a red exclamation mark is dis-
played.
TIP
If you wish to set similar scheduling for every day of the week start
by filling in “all” and then changing the desired days.
TIP
Set the stop time earlier than the start time so that the period extends
beyond midnight. Scheduling then stops at the set stop time the day
after.
Scheduling always starts on the date that the start time is set for.
NIBE F730Chapter 3 | F730 at your service50