EasyManua.ls Logo

Nordson Fulfill - Page 26

Nordson Fulfill
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Fulfill
Retrofit Kit DuraBlue/VersaBlue 25L and 50L Melters
22
Part 1105309A
E 2010 Nordson Corporation
Install the Tank Lid Components (contd)
9. See Figure 8.
S 25L melters - Open the lid, and then thread the ground wire through
the slot between the hinge and tank cover.
S 50L melters - Open the lid and then route the ground wire through the
gap between the tank cover and the central control tower.
DB/VB 25 DB/VB 50
Figure 8 Route the ground wire (DuraBlue/VersaBlue 25L and 50L)
10. Close the lid, and ensure that it seats correctly on top of the tank. Tighten
the screws securing the lid assembly (1) to the lid bracket (6).
11. See Figure 9. Open the lid and attach the folding brace to the underside
of the lid with the M4 flathead screw and locknut from the ship‐with kit.

Table of Contents

Related product manuals