iTrax® PC Pedestal
© 2022 Nordson Corporation
1617371-01
Power Connection
For installation, make the appropriate power connections and determine the best
knockout size and location for power drop.
Models 120 Vac 220 Vac 24 Vdc
Supply Voltage 120 V, 1 PH, 50-60 Hz 220 V, 1 PH, 50-60 Hz 24 Vdc
Full Load 8 A 4 A 16 A
Operation
Thermostat
See Figure 5 for thermostat locations. The thermostat is factory set at 95 - 100 °F.
The air conditioner will run until the setpoint temperature is achieved within the enclosure
and then the fans and cooling modules will shut down.
Backup Battery
The backup battery protects the PC in the event of temporary power loss or power
glitches. The backup battery is factory programmed to perform a controlled shutdown 60
seconds after the power is lost.
Table 1 Battery Backup Time Chart
Models 120 Vac (SDU 500B) 220 Vac (SDU 500B-5) 24 Vdc (SDU 10-24)
VA/Watts 500/300 500/300 —
Battery CSB XTV 1272F2FR Yuasa REW7-12FR Refer to Parts section
Load Level Approximate BackUp Time (Minutes)
20% — — 113 (2 A)
40% — — 45 (4 A)
50% 14:30 14:30 —
60% — — 30 (6 A)
80% — — 21 (8 A)
100% 4:20 4:20 14 (10 A)
NOTE: Run times in this table are approximate. Run times listed above can vary due to manufacturing variances of the
individual batteries.
Maintenance
Air Conditioner
Beyond occasional inspection for dust or dirt buildup no special maintenance should be
required.
Dry dust/dirt can be removed using compressed air to blow out the heat sinks. Do not
direct any high-pressure air at the fans.